Skip to main content
Vérification d’usines en Chine sur le terrain · 0% de commission
TCC
THE CHINA COMPASS
L2 CATEGORY // HS 9405.42SECTOR: Lighting & Electrical Equipment

Industrial LED High-Bay & Floodlights — China Supply Chain & Audit Benchmark

UFO LED high-bay fixtures, vapor-tight tri-proof lights, and DLC-listed warehouse luminaires.

TYPICAL FOB PRICE BAND
Custom Quote
Export-compliant OEM tiers
REAL OEM FACTORY MOQ
200 pcs (Real Plant)
Light logo trial: 100–300 pcs
BULK LEAD TIME
20 – 25 days
Sample dispatch: 3–5 days
B2B TRADER DISGUISE RATE
71% Middlemen
Verify license before deposit
TARGET-MARKET COMPLIANCE GATES:UL 1598DLC 5.1ETL ↗CE-EMC ↗ENECIP65/IP67
01 / CORE MANUFACTURING HUBS IN CHINA

Where Real Industrial LED High-Bay & Floodlights Factories Are Located

Zhongshan (Guzhen & Henglan), Guangdong

Commercial LED high-bays, linear architectural lighting & decorative luminaires

Buyer Watchout: Unverified trading shells sharing borrowed workshop photos.
Ningbo (Yuyao) & Wenzhou (Yueqing), Zhejiang

Die-cast outdoor floodlights, solar street lighting & terminal circuit breakers

Buyer Watchout: Unverified trading shells sharing borrowed workshop photos.
02 / BUYER SOURCING WATCHOUTS & PRE-SHIPMENT QC CHECKLIST

What Overseas Buyers Must Verify in Industrial LED High-Bay & Floodlights

Common material substitution shortcuts, compliance pitfalls, and mandatory pre-shipment inspection checks across this category — verify these contractually before wiring a 30% deposit.

WATCHOUT 01HIGH

Driver Substitution & Under-Weight Heat Sinks Causing Rapid Lumen Decay

Verification: Lock golden-sample empty housing net weight (±15g) and verify driver serial batch codes pre-shipment.

PRE-SHIPMENT & ON-SITE QC PROTOCOL

Standard Inspection Checklist for Industrial LED High-Bay & Floodlights

Attach these checkpoints to your bilingual Purchase Order & AQL 2.5 pre-shipment inspection brief:

  • 01Integrating sphere IES LM-79 test verification
  • 02IP65 water-jet & thermal equilibrium test
  • 03Driver BOM serial audit
03 / PRODUCT PRICING & FACTORY REPORTS

Product Cost & Source Factory Breakdowns in Industrial LED High-Bay & Floodlights

Product ReportFOB BenchmarkLogo / OEM MOQLead TimeAction
See Tiers
200 – 500 pcs
Logo: 20 pcs
20 – 25 daysView Cost & Plant →
04 / VERIFIED OEM FACTORIES IN THIS CATEGORY (1)

Audited Source Manufacturers — Industrial LED High-Bay & Floodlights

Desensitized corporate licensing, insured workforce, and workshop capability profiles aggregated from verified producers in this category.

SHORTLISTED PLANT #SP-01|Shenzhen Bao'an / Dongguan Tangxia, Guangdong
VERIFIED PRODUCER
WORKFORCE SCALE TIER
Tier B · 60–160 Production Staff
TOOLING & R&D TIER
In-House Tooling Shop & Active Utility IP
CAPITAL & ASSET TIER
Verified Industrial Equipment & Paid-In Tier
36M DELIVERY & QUALITY SCREEN
Clear · Zero Quality or Delivery Defaults (36m)
ANALYST VERDICT //Verified Smart Pet Hardware ODM holding lifetime US FCC Grantee Code 2A8P9 with clean internal PCBA layout and anti-pinch safety aging lines.
WORKSHOP, PRODUCTION LINE & IN-HOUSE QC PHOTOSONSHORE VERIFIED
Audit DimensionClaimed (B2B Platform Profile)Verified (Independent Desk & On-Site Audit)
FCC Grantee Ownership
VERIFIED MATCH
FCC / CE Certified Smart FeederDirect Holder of US FCC Grantee #2A8P9 (Internal Teardown Photos Matched)
FCC Grantee & PCBA Architecture
VERIFIED MATCH
Category Technical RequirementDirect US FCC Grantee Holder · Clean In-House PCBA
Pet Safety & Load-Bearing Lab
VERIFIED MATCH
Category Technical RequirementTriple-Redundancy Anti-Pinch Sensor Aging Lab Verified
Type a product keyword, 4-digit HS code, masked factory ID, or B2B supplier link...
↑↓ Navigate · ↵ Open · ESC CloseTHE CHINA COMPASS // GLOBAL INTEL SEARCH
TCC

China Onshore Verification Desk

HANGZHOU & SHENZHEN · INTERACTIVE SCOPE BUILDER
TARGET:
PAIEMENT EXPRESS · LIVRAISON PDF & E-MAIL

China Supply Chain & Factory Verification Dossier

Choisissez votre édition
Sans création de compte ni mot de passe.
VISAMastercardAMEXApple PayGoogle Pay
🔒 Chiffrement SSL 256 bits · Facture fiscale officielle incluse
Déjà un compte client ?Se connecter →