Skip to main content
Verificação de fábricas na China in loco · 0% comissão oculta
TCC
THE CHINA COMPASS
L2 CATEGORY // HS 8504.40SECTOR: Consumer Electronics

GaN Chargers & Power Delivery — China Supply Chain & Audit Benchmark

Multi-port GaN USB-C PD chargers, desktop power stations, and UL/ETL listed switching adapters.

TYPICAL FOB PRICE BAND
Custom Quote
Export-compliant OEM tiers
REAL OEM FACTORY MOQ
1,000 pcs
Light logo trial: 100–300 pcs
BULK LEAD TIME
25 – 30 days
Sample dispatch: 3–5 days
B2B TRADER DISGUISE RATE
70% Middlemen
Verify license before deposit
TARGET-MARKET COMPLIANCE GATES:UL 62368-1FCC Part 15B / ID ↗CE-LVD/EMC ↗RoHS 2.0 ↗JP PSE / KR KC
01 / CORE MANUFACTURING HUBS IN CHINA

Where Real GaN Chargers & Power Delivery Factories Are Located

Shenzhen (Bao’an Shajing & Guangming), Guangdong

GaN PD fast chargers, high-speed SMT lines, wireless audio & smart IoT hardware

Buyer Watchout: Manual wave-soldered safety capacitors and fake UL file numbers on AC/DC adapters.
Dongguan (Tangxia & Fenggang), Guangdong

High-volume power banks, Acoustic enclosures, Li-Po pack integration & injection tooling

Buyer Watchout: Recycled EV/laptop battery cells repackaged in new PVC heat-shrink sleeves.
02 / BUYER SOURCING WATCHOUTS & PRE-SHIPMENT QC CHECKLIST

What Overseas Buyers Must Verify in GaN Chargers & Power Delivery

Common material substitution shortcuts, compliance pitfalls, and mandatory pre-shipment inspection checks across this category — verify these contractually before wiring a 30% deposit.

WATCHOUT 01CRITICAL

Fake UL / ETL File Numbers & Insufficient Primary-Secondary Creepage (<6.4mm)

Verification: Verify UL Product iQ / Intertek directory file ownership and perform teardown PCB creepage caliper audit.

PRE-SHIPMENT & ON-SITE QC PROTOCOL

Standard Inspection Checklist for GaN Chargers & Power Delivery

Attach these checkpoints to your bilingual Purchase Order & AQL 2.5 pre-shipment inspection brief:

  • 01UL 62368-1 file check
  • 02100% 4-hour full-load burn-in aging room verification
  • 03Hi-Pot 3000VAC inline test log audit
03 / PRODUCT PRICING & FACTORY REPORTS

Product Cost & Source Factory Breakdowns in GaN Chargers & Power Delivery

Product ReportFOB BenchmarkLogo / OEM MOQLead TimeAction
See Tiers
1,000 – 2,000 pcs
Logo: 100 pcs
25 – 30 daysView Cost & Plant →
04 / VERIFIED OEM FACTORIES IN THIS CATEGORY (1)

Audited Source Manufacturers — GaN Chargers & Power Delivery

Desensitized corporate licensing, insured workforce, and workshop capability profiles aggregated from verified producers in this category.

SHORTLISTED PLANT #SP-01|Shenzhen · Cross-Border E-Commerce Park, Guangdong
HIGH RISK · TRADER DISGUISE
WORKFORCE SCALE TIER
Micro · 5–10 Office Staff
TOOLING & R&D TIER
Zero Production or Battery Testing Equipment
CAPITAL & ASSET TIER
Tier-C · Unfunded Subscribed Capital Only
36M DELIVERY & QUALITY SCREEN
Critical · Dangerous-Goods Misdeclaration & Contract Claims Flagged
ANALYST VERDICT //Cross-border B2B trading company marketing public-mold cordless blenders built with recycled AS plastic, unprotected B-grade 18650 cells, and mismatched UN38.3 battery certificates.
Audit DimensionClaimed (B2B Platform Profile)Verified (Independent Desk & On-Site Audit)
Manufacturing Permit & Lines
FABRICATED / MISMATCH
"Shenzhen Appliance Factory · 6 Assembly Lines"E-commerce trading scope only — zero factory floor; finished goods bought from spot assembly stalls
Jar Material & BPA Status
FABRICATED / MISMATCH
"BPA-Free Tritan Cup"FTIR polymer scan confirmed brittle SAN/AS + recycled PC blend; stress-cracks within 10 minutes of citrus-oil contact
UN38.3 & MSDS Battery Report
FABRICATED / MISMATCH
"Ready for Air & Sea Hazmat Shipping"Provided UN38.3 report covers a single 3.7V cell, whereas shipped unit contains an uncertified 2-cell pack
Type a product keyword, 4-digit HS code, masked factory ID, or B2B supplier link...
↑↓ Navigate · ↵ Open · ESC CloseTHE CHINA COMPASS // GLOBAL INTEL SEARCH
TCC

China Onshore Verification Desk

HANGZHOU & SHENZHEN · INTERACTIVE SCOPE BUILDER
TARGET:
CHECKOUT EXPRESSO · ENTREGA PDF E E-MAIL

China Supply Chain & Factory Verification Dossier

Selecione a edição
Sem necessidade de cadastro ou senha.
VISAMastercardAMEXApple PayGoogle Pay
🔒 SSL 256-Bit · Fatura comercial oficial incluída
Já possui conta?Entrar →